Why CircuitMap
Compared with what you do today
CircuitMap puts every board and circuit on your own floor plans. Every alternative on this page is the right answer for somebody. Here is where each one works, where each one fails, and where we would tell you not to buy from us.
- The drawing cupboard
- A spreadsheet
- Your CAFM system
- A full re-survey
Side by side
The same eight questions, answered two ways
No ticks, no crosses. Just what actually happens in each case. You will recognise the left-hand column.
Someone asks what feeds a socket
Find the folder, find the right sheet, hope it was updated after the 2019 refit, then switch things off to be sure.
Search the room and read the answer: board, way, protective device, what else is on it. DB1 · Way 4 · 32A RCBO
A contractor finishes a small works order
They leave site. The drawing is marked up in biro if you are lucky, and the schedule inside the board door quietly stops matching the board.
They edit the circuit before they leave site — one screen, one question at a time — so the record is right the moment the job is.
You need the schedule for the board door
Pay someone with a CAD licence to redraw it, or photocopy the last one and write on it again.
Press DB Schedule, print A4 landscape. Laid out to BS 7671:2018+A4:2026 Reg 514.9.1, generated from the live record.
An engineer needs details at the board
Ring the office, wait, describe the board over the phone, get sent a PDF that will not open on a phone.
Scan the QR label on the board door. Circuits, photos, documents and notes, on the phone, in the cupboard.
The person who knew the building leaves
The knowledge goes with them. The next person spends about two years building it back up.
It was never in one head. It is in the record, with every change dated and a name against it.
An EICR or insurance inspection is due
Someone remembers. Or they do not, and you find out from the renewal letter.
Due dates are colour-coded across your buildings, everything falling due in the next 45 days sits on one card, and a daily digest emails whoever owns it.
You are drilling through a slab
Two plans, two scales, a tape measure and a bit of faith.
Floors are lined up to the same footprint, so a point marked on one plan shows where it lands on the floor above and below.
IT asks where the data goes
A shared drive nobody owns, three inboxes, and a spreadsheet on somebody's laptop.
Your own server. Single tenant. No outbound connection needed, and every export is in an open format you can take with you.
When you do not need CircuitMap
One small building, a twelve-way board, and the same person holding the keys for fifteen years? A spreadsheet is genuinely fine, and we would rather you kept it. CircuitMap starts to pay for itself at the second board, the second person or the second contractor. That is the point where the record stops being somebody’s memory and has to stand on its own.
The alternatives
What else you could sensibly do
Including the two cases where we would tell you to keep what you have.
The drawing cupboard
As-built drawings, the handover O&M pack, and the schedule taped inside the board door.
- Where it works
- It is free, it is already there, and on handover day it was right.
- Where it fails
- It has no way of telling you it is wrong. Every alteration since handover either made it into the pack or quietly did not, and nothing records which. Silent failure is the worst kind.
Keep it as history. Stop treating it as the current record.
A spreadsheet
One tab per board, kept up by whoever cares most.
- Where it works
- Genuinely fine for a small building with one board and one person. Cheap, portable, and anyone can read it.
- Where it fails
- It has no idea where anything is. It cannot show which rooms a circuit feeds, print a compliant schedule, or be scanned at the board — and it lives on one person's drive. There is no history either. The version from before last summer's works is gone.
The right answer until you have a second board, a second person or a second contractor.
Your CAFM or CMMS
Work orders, PPM schedules, asset registers, contractor management.
- Where it works
- It is the right tool for tracking work, and you should keep it. It is probably already part of how your team runs.
- Where it fails
- It tracks the work, not the building. Ask most CAFM systems which board feeds Room 214, or for a BS 7671 board schedule, or to show a circuit's coverage on a plan, and you are back in the drawing cupboard.
It sits alongside, not against. The CAFM ticket links out to the record; CircuitMap holds it.
A full M&E re-survey
Bring a consultancy in to walk the buildings and redraw everything.
- Where it works
- You get an accurate snapshot, produced by people who do this for a living. Sometimes it is exactly the right thing to buy.
- Where it fails
- A snapshot is all it is. The drift starts again the day they leave site, and in three years you are getting it quoted a second time. The deliverable is usually PDFs, which is where the last set went to die.
Survey once if you must, then keep it alive in something your own team can edit in a minute.
The clearest example
One board, two records
On the left, the schedule taped inside the door today. On the right, the one CircuitMap prints from the live record. Drag the handle.
Objections
The five things people push back on
These come up on nearly every call, so they may as well be answered before it.
Ask us something harder →Our team will not keep it updated. That is what killed the last system.
We already pay for a CAFM system. Why another subscription?
Is this not just a document store with a floor plan?
What if you go out of business?
We have almost no existing documentation. Is that a problem?
Judge it against your own building
Bring one floor plan to a 30-minute call. We will map a real board from your site on screen, and if it is not better than what you already have, we will say so.
No pitch deck. No credit card. No follow-up sequence.